For the Wukro Cable Manufacturing Plant, this represents a signature track record project executed by Wagwago Electric in 2024. It showcases our operational capabilities, technical expertise, and group-wide integration.
The facility was contracted, fully equipped, and commissioned for the national power utility.
By combining in-house engineering, localized manufacturing, and nationwide supply chains, Wagwago delivers measurable performance and long-term asset value across all sectors.
Through the Wukro cable manufacturing plant, we proved that Ethiopian industry and engineering can match international specifications with local agility.
